Electrical layouts in particular require many different items and abbreviations and accompanied by a key symbols provide a clear and tidy method of identifying their.
Finished floor elevation symbol.
Elevations show the locations and types of doors and windows.
Each different type of window.
The list of abbreviations used in a set of architectural drawings varies from office to office.
Typical usage is no component of a hanging li.
Finished floor f f elevation is a reference plane used as a zero point for vertical dimensions.
N the floor of a basement where basement means the floor is below grade on all sides will always be the lowest floor regardless of how the.
Floor plans site plans elevations and other architectural diagrams are generally pretty self explanatory but the devil s often in the details.
Finished floor level designing buildings wiki share your construction industry knowledge.
N note that any below bfe finished areas includ ing foyers will violate nfip requirements may sustain unreimbursable flood damage and make the building subject to increased flood insurance premiums.
Note that figure 1 6 shows the footings are below grade.
That wall would be 16 feet 6 inches above the finish floor.
The centerline symbol of alternate long and short dashes shows finished floor lines the hidden line symbol of short evenly spaced dashes shows foundations below the grade line.
For example you may have masonry walls on the sides of the building showing top of wall at 16 feet 6 inches on the drawings.
Reference plane as it s name implies is the top surface of the finished flooring material.
Wall section or elevation reference drawing number existing point elevation plan 461 0 461 0 test boring new contours elevation noted on high side existing contours elevation noted on high side tb 1 268 320 c a 9 7 a 11 detail reference drawing number room space number equipment number 7 a 12 1302 354 drawing conventions and symbols cont.
Finished floor level ffl refers to the uppermost surface of a floor once construction has been completed but before any finishes have been applied.
The finish floor is then considered ff 0 0.
Once the finish floor elevation is established the other project elevations are based off the finish floor.
So in concrete construction it may be the uppermost surface of a screeded finish or in timber construction ffl will denote the top level of.